We use our own and third-party cookies to improve browsing and provide content of interest.

In continuing we understand that you accept our Cookies Policy. You can modify the cookies storage options in your browser. Learn more

I understand

业绩清单

电能管理和功率因数校正土耳其电信中心国际项目

TurkTelecom
Executing company

CIRCUTOR

Sector

Telecommunications

Project

Nation-wide project for electric energy management and power factor correction in Turk Telekom centres

Client

Türk Telekom (Turkey)

Background / objectives

The telephone company opened a request for bids and CIRCUTOR won against world-class competitors.
The goal was to define a cabinet with two functionalities: energy measurement units with communication capacities and a capacitor bank to reduce reactive power, filter harmonics in the network and optimise the power available in the network for each centre.
All centres should be interconnected with our software

General description

The purpose was to design a special reactive energy regulator and expand the existing reactor product range, all in record time and with a minimal impact on cost.
CIRCUTOR offered and supplied the products, which were assembled in Turkey by our subsidiary.
830 units were initially installed in 2009.

Key features / Results
  • A successfully completed project by CIRCUTOR in a major national telecommunications company
  • The project was subsequently expanded to 1,000 centres
  • A more usable network was achieved (20% more), as well as the advantage of having energy measurements and power reports in real time at each centre.
  • As an intangible result, CIRCUTOR's market image was boosted with this prestigious project

联系我们:
t. (+34) 93 745 29 00
 

circutor32x32

联系方式

CIRCUTOR, SA
Vial Sant Jordi s/n, 08232
Viladecavalls (Barcelona) Spain
Tel: (+34) 93 745 29 00
Fax (+34) 93 745 29 14

技术支持

(+34) 93 745 29 19

SAT