University of Zaragoza energy management system

univ-zaragoza
Implementing company

CIRCUTOR’S Expert,  EffiTool

Sector

Universities

Project

University of Zaragoza energy management system

Client / Customer

The University of Zaragoza

History / Objectives

The University of Zaragoza recently implemented an energy management system in its facilities. The objectives were as follows:

  • To find out the electric consumption of its buildings and to allocate the corresponding energy costs
  • To conduct a comparative study with a view to implementing the good practices being used in buildings where lower consumption is detected.
  • To detect deviations in electrical  energy consumption caused by potential breakdowns, failures of the air conditioning timing and control systems and misuse of the various installations
General description

Until now, a part of the distribution of low-voltage electrical energy at the University of Zaragoza has been carried out from 4 transformers, but it has not been possible to break down the energy billing data. By installing 9 CIRCUTOR CVMK2-ITF-405 power analyzers with K2-EXP-SD-MODBUS/TCP cards, the University has beenable to solve this problem, as they can now monitor consumption through the PowerStudio Scada program

Remarkable aspects / Results
  • Them not only visualise data on instantaneous consumption but also save logs of supply voltages, power consumption, harmonic content, wave quality and power factor
  • With this software they can get alarm signals when deviations in the nominal voltage values, disconnections of the main switch or excess consumption of reactive energy are detected
  • The software configuration displays the supply tension, phase current and power consumed by the 9 power analyzers on a single screen, or, with a simple click on the map of the campus served by the analyzer in question, provides more detailed information

Contact us:
t. (+34) 93 745 29 00
 

Remote global management of the Moroccan TV installations

TelecomMarroc
Executing company

Elexpert

Sector

Telecommunications

Project

Remote global management of the Moroccan TV installations

  Client

SOCIÉTÉ National de Radiodiffusion et de Télevision  SNRT  (Morroco)

Background / objectives

Our conciliatory Elexpert has designed a system with various objectives:

  • Maximum demand management: controls consumption and prevents exceeding the power contracted from the utility company, disconnecting non-essential lines such as air conditioning.

  • Real time control of energy, power quality and other critical electrical parameters (harmonics, leakage current)

  • Controls and prevents unwanted tripping in the general switch of antennas and remote installations, sends an SMS in case incidents are detected
General description

Various units are being installed for different purposes:

  • QNA network quality units with GPRS installed remotely sends all consumption data and incidents to a central server
  • CVMk2 measurement units and the PowerStudio management software

  • Motorised automatic reclosing units allow the switch to reconnect when the leakage or the overload of the installation disappears with no need to send staff to the site
Key features / Results
  • The customer can achieve an optimum overall management

  • Analysis of the service quality

  • Maintenance continuity and optimisation

Contact us:
t. (+34) 93 745 29 00
 

Electric energy management system in the steel industry

Arcelor
Executing company

IMSAT Romania

Sector

Heavy industry

  Project

Electric energy management system in the steel industry

  Client

ARCELOR MITTAL

Background / objectives

Our conciliatory in Romania, IMSAT, has designed an electric energy management system to reduce power consumption by 20% and to control installations in real time at all times

General description

It has installed power factor compensation units and harmonic filtering to optimise available power in the mains and reduce disturbances that could damage units.
It has also installed measuring units that evaluate the unit cost of the product in order to incorporate improvement objectives and general management, software, allowing reports to be generated and process alarms to be received

Key features / Results
  • Reduced energy consumption of the plant by 15%
  • Optimisation of production costs
  • Quick detection of incidents
  • Optimisation of maintenance time
  • Possibility of performing a comparative study of efficiency in other Arcelor plants in other countries, as it is a multinational in the sector

Contact us:
t. (+34) 93 745 29 00
 

Improve electric energy management and energy quality in the Venezuela FORD manufacturing plant

Ford
Executing company

Energytech

Sector

Automotive

Project

Improve electric energy management and energy quality in the Venezuela FORD manufacturing plant

  Client

FORD

Background / objectives

Our conciliatory Energytech has conducted a preliminary study with measures on the ground using AR5-L CIRCUTOR power analyzers in order to suggest improvements for optimising the electric energy management in the plant, reducing harmonics and improving available power.
It has found some problems, such as:

  • Poor energy efficiency in generation
  • Reduced useful life of units due to heating, transformers, cables, etc.
  • Limitations in infrastructure to incorporate new loads
  • Generation inefficiency
  • Large voltage drop in lines
General description

Medium voltage capacitor banks and two 2 x 5 MW generation turbines have been installed in 8 substations

Key features / Results
  • 1336 kVA of power recovered
  • 16.54 % of power recovered in line
  • 19.9% reduction of lossesIncreased production capacity by discharging reactive energy lines and harmonics
  • Reduced maintenance costs
  • Better mains voltage quality and increased electrical system efficiency

Contact us:
t. (+34) 93 745 29 00
 

Nation-wide project for electric energy management and power factor correction in Turk Telekom centres

TurkTelecom
Executing company

CIRCUTOR

Sector

Telecommunications

Project

Nation-wide project for electric energy management and power factor correction in Turk Telekom centres

Client

Türk Telekom (Turkey)

Background / objectives

The telephone company opened a request for bids and CIRCUTOR won against world-class competitors.
The goal was to define a cabinet with two functionalities: energy measurement units with communication capacities and a capacitor bank to reduce reactive power, filter harmonics in the network and optimise the power available in the network for each centre.
All centres should be interconnected with our software

General description

The purpose was to design a special reactive energy regulator and expand the existing reactor product range, all in record time and with a minimal impact on cost.
CIRCUTOR offered and supplied the products, which were assembled in Turkey by our subsidiary.
830 units were initially installed in 2009.

Key features / Results
  • A successfully completed project by CIRCUTOR in a major national telecommunications company
  • The project was subsequently expanded to 1,000 centres
  • A more usable network was achieved (20% more), as well as the advantage of having energy measurements and power reports in real time at each centre.
  • As an intangible result, CIRCUTOR's market image was boosted with this prestigious project

Contact us:
t. (+34) 93 745 29 00
 

Electrical energy management systems in Mexico’s CINEMARK cinema complexes

Implementing company

CIR-MEX CIRCUTOR Expert Mexico

Sector

Cinema complexes

Project

Entertainment and energy efficiency. Electrical energy management systems in Mexico’s CINEMARK cinema complexes

Client / Customer

CINEMARK

History / Objectives

Cinemark is an international company, leader in the reproduction of moving images, with 431 complexes and almost 5,000 screens in 15 countries. In Mexico, it has 31 complexes and is ranked third in terms of the most important motion picture exhibitors.

Objetives:
  • Monitor the main electrical parameters (Voltage, Current, Power, Power factor, Distortions, Energy).
  • Show real-time graphics on performance between complexes
  • Monthly reporting on energy consumption in each complex in the form of a bill, similar to that of a power
General description

All Cinemark complexes receive medium voltage electric supply and almost all have 2 transformers, one at 220 VAC, for the cinema’s general services, and another at 440 VAC, which supplies energy for the whole air conditioning system. As a result, a monitor was introduced in each transformer for each complex, enabling separate readings of the consumption of cooling loads (highest consumer in cinemas) for the rest of the electrical system.

Key features / Results
  • Control electrical energy by supervising the performance of each complex,
  • Identify and measure energy indexes which determine the profitability of each complex, making it possible to achieve Electrical Energy Efficiency internally.
  • Energy consumption per square metre
  • Energy consumption per visitor
  • Comparison of energy consumption between complexes to propose energy limits for similar complexes and achieve a standard level of consumption for each of them
  • Identification of energy consumption during non-operational times.
  • Detection of problems with energy quality, such as harmonic currents, failures in electric supply, low power factor, etc..
  • Investment opportunities in energysaving technologies
  • Checking of energy-saving measurements in real-time
  • Corroboration of energy billing

Contact us:
t. (+34) 93 745 29 00
 

Filtration and network optimisation system in a tobacco factory in Guanzhou (China)

Tabacalera
Executing company

CIRCUTOR

Sector

Tobacco industry

Project

Filtration and network optimisation system in a tobacco factory in Guanzhou (China)

Client

DOUBLE HAPPINESS

Background / objectives

The local contractor issued a public request for bids, in which three companies, including CIRCUTOR, made bids. First, it conducted an on-site technical study with measurements, then CIRCUTOR was offered the project, as it was the most competitive in terms of price/performance. The goal is to improve the network to avoid oversizing transformers

General description

Installation of 22 AFQ active filter cabinets in the 16 factory transformers

Key features / Results
  • Improvement in the level of harmonic distortion from 29% to 5%
  • Balanced phases to reduce the neutral current..
  • Reduction of the power factor, eliminating the reactive power and optimising the active power available in the network
  • Customer satisfaction, planned extension of the project with 40 more units

Contact us:
t. (+34) 93 745 29 00
 

Implementation of Energy Management Systems at the Food Industry

octubre-rojo-babaevski
Implementig company

Polykit, CIRCUTOR distribuitor AND  Expert in Power Studio Scada

Sector

Food Industry

  Project

Implementation of Energy Management Systems at the Food Industry

Client/Customer

They are Babaevskiy sweet and candy factory, and Red October, chocolate manufacturer

History / objectives

Polykit, CIRCUTOR distributor and Expert in Power Studio Scada for the Russian Federation, has developed a Power Studio Scada application in two Companies dedicated to the food industry with long tradition in Russia since 1804, located in the center of  Moscow

General description

There gradually has been implemented an Energy Management System consisting of Power Studio Scada deluxe software, TCP2RS converters, Powernet, CVM-NRG and CVM-k, including another manufacturer’s devices. These equipment have been installed in substations, main distribution panels and production lines.

Remarkable aspects / results
  • The first advantage of the system isthe reduction in the energy bill around 5-6%

  • In addition the imputation of energy unit cost of each manufactured product.

  • In addition the Energy Manager may survey the right execution in the manufacturing process: efficient rearrangement of power supply

  • Punctual start and end of working shifts

  • Detection and elimination of non useful energy used in the manufacturing process.


Contact us:
t. (+34) 93 745 29 00
 

Project: Green Building. Electricity consumption management applied in Universities

Wisconsin
Implementing company

CIRCUTOR, SA, National Meter Industries

Sector

Public Universities

Project

Efficient Universities Project: Green Building.
Electricity consumption management applied in Universities

Client/Customer

The University of Wisconsin Madison

History/ objectives

The University of Wisconsin, which has 13 campuses spread around different locations and a total of 182,000 students enrolled, decided to begin the Green Building Project. This project aims to reduce its electricity consumption each year until 2015.
To this end, we provided National Meter Industries with the latest equipment from the CVM family.

General description

Due to their characteristics, these devices are ideally suited for controlling consumption and the main electrical variables: network analysis and monitoring, remote communications (RS-485), 480V power supply (essential in the American market) and reduced dimensions. Currently, the project requires that communications can be converted to the BACnet protocol, which was achieved by using external transducers.

Remarkable aspects/results
Currently, the information network created by the university uses CVM data (Energy, KW demand, and currents):
  • To manage their HVAC system
  • Lighting system and other electrical loads
  • Furthermore, the increased efficiency in the installation is verified with the data acquired over time

Contact us:
t. (+34) 93 745 29 00
 

circutor32x32

Contact

CIRCUTOR, SA
Vial Sant Jordi s/n, 08232
Viladecavalls (Barcelona) Spain
Tel: (+34) 93 745 29 00
Fax (+34) 93 745 29 14

Technical Support

(+34) 93 745 29 19

SAT

© 2015 circutor.com. All rights reserved.